Protect Your Investment: The Critical Role of As-Built Drawings on your construction project.
What are As-Built Drawings In my first job after graduating with a civil engineering degree from Penn State, I oversaw a $5 million Manufacturing Plant on 35 acres. During construction, we installed a 6” fire water line from the pump building throughout the project to the three main buildings: the Manufacturing building, the warehouse, and the office building. The contract drawings show the fire line to be constructed under the concrete driveways. The drawings did not provide dimensions for any of the buildings. So, we installed it directly between the buildings, about 20 feet off the manufacturing and the warehouse building. We did not survey in this placement of the fire line. We completed the fire line and then constructed the concrete slab over it. Before we completed the project, we had a water leak in front of the warehouse. We measured 20 feet from the warehouse and saw cut and busted out a 5’ by 5’ section of concrete and dug down, expecting to find the water line an...