Disaster Beneath the Floor: Preventing Catastrophic Slab Collapse

 

Industrial Building Slab Failure 

My Geotechnical Firm performed a Geoforensic investigation of a recently built Industrial building constructed in the Houston area. They investigated the failing interior concrete slab.




They documented over 80 cracks from under 10’ to over 40’ in length and from .02” to .06” in width.









They core drilled the slab and performed compressive tests. The results weren’t good.


Through their laboratory analysis, they determined that 

1) Water was added at the project site, which affected the consistency of the mix. 

2) An inferior aggregate was used in the mix. 

3) The control spacing was measured from 15’ to 25’ and the depth was .25”.

ACI recommends that the control joint be ¼ the thickness of the slab. A 7” slab should have a control depth of 1.75”. Control joint spacing should be twice the thickness of the slab in feet. Therefore, for a 7” slab, the maximum joint distance should be 14’.

4) Based on the forklift that was present during their investigation, they determined that they would need a 10” slab. 

5) Rebar depth. On all of the cores, they found that the reinforcing steel was placed near the bottom of the slab.




Let's learn from our failures. The B-17 Flying Fortress crashed on its maiden voyage in 1935. They installed the Pre-flight checklist. Let's do it for our jobs.

Check out my blog below. 

Beyond the Pour: Your Ultimate Concrete Foundation Checklist Blog

 

Shettig Construction Management provides Professional Construction Management services from the inception of your project through completion. www.shettig.com

mshettig@gmail.com





























Comments

Popular Posts

Build Faster, Smarter: Is the Design-Build Method Right for Your Project?

Building Smarter: The Power of Pre-Construction in Design-Build

Beyond the Dig: A Quality Control Checklist for Site Excavation