How do you Mobilize on your Construction Project?

Start your project off right with a 

Checklist for Mobilization 



Field Engineering

1. Ensure that survey information is available and accurate. Verify that there are sufficient benchmarks, monuments, and stakes to identify key points. 




2. Verify the requirements for field engineering for the layout of the construction project. 


 Verify your property corners are set.
 

3. Verify that all permits and approvals have been obtained from all jurisdictional agencies.

4. Obtain a geotechnical investigation including subsurface ground moisture, bearing capacity of the soils, geological features, chemical compositions, and other items about the sub-surface conditions. 

Erosion Control & SWPPP

5. Review the permitting process with your state on the Stormwater pollution prevention plan (SWPPP). And ensure plans for erosion and soil control. At a minimum, you should expect.

1. Silt Fence 

    A silt fence will be constructed on the perimeter of your lot or property to collect any soil runoff. If you have a sloped lot, then the silt fence would be at the low end of the property. 

2. Construction Entrance

 Your plan should include constructing a temporary gravel entrance or a fabricated mat. This helps prevent soil from the site being deposited on the streets. 

3. Concrete wash-out areas. 

During the concrete portion of the project, your plan should show an area where the concrete trucks can wash out their trucks. You could also use this area for your masons to wash out. 

Layout of Temporary Facilities

6. Verify the location of vehicle access and parking. Determine your overall plan for the placement of office trailers, dumpsters, storage trailers, and temporary toilets. 









7. Ensure that a Job Safety Program is developed and maintained. 

8. Identify the testing agencies for your project. 

9. Ensure that you have set up temporary power. Ensure that all working conditions are provided to facilitate good workmanship and worker safety. 

10. If necessary, provide temporary perimeter security fencing. 


Shettig Construction Management provides Professional Construction Management services from the inception of your project through completion. www.shettig.com

mshettig@gmail.com



 






Comments

Popular Posts

When is it good to use the Design-Build Method on Construction Projects?

Notices of Nonperformance to a Trade Contractor on a construction project

Pre-Construction in the Design Build Method of Construction