Built to Last: The Ultimate Wood Framing Checklist
FRAMING QUALITY CHECKLIST
WALL FRAMING |
|||||||||||
1) Are the walls square? (check 3-4-5 method) |
|||||||||||
2) Are the walls plumb? |
|||||||||||
3) Are all the studs 16” on center or per print? |
|||||||||||
4) Are all the studs crowned consistently? |
|||||||||||
5) Are the walls free of twisted or bowed studs? |
|||||||||||
6) Are all the corners framed correctly? Build California Corners to get maximum insulation on exterior walls.
|
17) Are the Medicine cabinets framed per print? |
18) Are the Attic access openings framed correctly? 19) Verify that the plywood or OSB sheathing is applied as specified: Grade, dimension, staggering, nailing, blocking, and no overdriven nails. 20) Verify that the sheathing paper air infiltration vapor barrier is provided as required and installed properly and not damaged. Are the trusses spaced 2' on center or per the drawings? ROOF FRAMING Are the truss clips evident on the center and on the exterior walls? Is the gable end truss bracing evident and correct? Is the roof framing installed with metal "H" clips? MISCELLANEOUS FRAMING Is the site free of trash and framing debris? Are there no signs of floor squeaks? Is there no evident floor spring or bounce? Shettig Construction Management provides Professional Construction Management services from the inception of your project through completion. www.shettig.com mshettig@gmail.com 08 |
Comments
Post a Comment