Built to Last: The Essential Quality Control Checklist for Pre-Engineered Metal Buildings (PEMB)

Image
   Pre-Engineered Metal Building      Structural Inspections Crane Setup and Location Meet with your crane operator and review a lifting plan before work commences. Consider all the aspects of the lift; 1)      Weight 2)     Center of gravity 3)     Lifting points on the load 4)     The path that the load will travel during the lift. 5)     Review the capabilities of the crane, review the load tables, or the instrument of loading. 6)     Consider the wind 7)     Communication during the whole process of the lift. 8)     Are the outrigger pads a sufficient size?   Perform a bearing capacity check by a geotechnical engineer for any crane or concrete pump truck outrigger used on the project. Set up a sequence plan for the erection of the building 1) Are all anchor bolts washered and properly nutted? 2) Is t...